HD Hyundai Oilbank Gas Station makes an effort to improve quality of differentiated customer service with its slogan as the center, ‘Good Service Bank!’. We allocated a Service expert called MD (Market Designer) to the nationwide to systemically manage cleanliness and quality service of gas stations and run promotions for each region including concerts, festivals and affiliate programs. We are also operating a variety of programs to upgrade the class of our gas stations such as ‘Service Campaign’ that lets customers select the excellent gas station, ‘Dream Team’ that provides service demonstration and staff training, ‘Customer Service Manual’ for standardized service, ‘Service Leader Academy’ for gas station owners and other guest events. In addition, we expand Point Rewards Program by partnering up with various types of business including department stores, online shops, automobiles, food and beverages and many more.
Opening Process
- Analysis on Business District and Conditions of Location: Town planning, Road types, etc.
- Review the Likelihood of Gas Station Registration and Permission: Registration standards of Gas Station, Regulations, Administrative Regulations.
- Review Profitability of Gas Station Operation: Sales volume, Operating profits considering Investment costs.
for Construction
and Dangerous Substances
Installation
- Select Architectural Design Office (Construction/Civil Engineering)
- Check details of Gas Station Construction Licensing
- Finalize Layout of Gas Station and Create Design Drawings
- Apply for Permission for Gas Station Construction and Dangerous Substances Installation: Construction, Dangerous substances, Road Occupation, Change in the form and quality, etc
- Conclude Petroleum Product Supply Contract
Construction
- Compute Cost of Gas Station Construction
- Select Construction Company for Gas Station and Approve Construction
- Supervise Gas Station Construction work
- Apply for Business License: Issued by Competent Tax Office
- Order and Install Equipment such as Lubricators and Car Wash Machines
- Training for Dangerous Substances Safety Officer and Carrier
of Gas Station
Construction
- Inspection of Construction Usage Permission and completion of Installation of Dangerous Substances
- Registration of a Petroleum Sales Business (Review completed on Permission for Gas Station Construction and Dangerous Substances Installation)
- Payment of Acquisition Tax and Registration Tax, Registration of Ownership
- Purchase of the various Insurances related to Gas Station Operation
- Job posting for employees (Manager, Staff)
- Employment and Training, Appoint all required personnel
- Consultation on Gas Station Operation
- Print out Management Forms, Establish Sales Promotion
- Purchase Equipment and Stationery, Manufacture Oil Station Gauge
- Select Tax Accountants
- Select Credit Card Affiliate and VAN Company
of Business
- Purchase Oil: In accordance with Product Supply Contract
- Test Operation / Business Launch, Opening Ceremony
- Report Business Launch
- Soil Pollution Inspection (within 6 months)
Summary of Licensing Items
Classification | Licensing Items | Relevant Regulations | Relevant Organization | Required Duration |
---|---|---|---|---|
PreConstruction | Permission for Diversion of Farmland | Agricultural Land Act | Farmland Policy Division | - |
Permission for Clearing Forest (Changes in the form and quality of a Forest) | Forestry Act | Forest Division | 3 months | |
Traffic Impact Assessment (Site with 1500m2 and over) | Impact Evaluation Regulations on Environment / Transportation / Disaster | Forest Division | 3 months | |
Permission for River Occupation | Rivers Act / Public Ownership Occupation | Construction Division | - | |
Permission for Public Water Resource Occupation | Control Act | - | 7 days | |
Permission for Road Occupation | Road Act | Construction Division | 5 days | |
Permission for Excavation | Road Act | Construction Division | - | |
Application for Transplant of Trees on the street | Road Act | Green Division | 5 days | |
Application for Construction Permission | Building Act, etc | Architecture Division/City Division | 7 days | |
Dangerous Substances Production Output | Dangerous Substances | Fire Station | 15 days | |
Application for Installation Permission | Safety Control Act | - | 5 days | |
After Construction ~ PreCompletion |
Construction Report | Building Act | Architecture Division | 1 day |
Application for Temporary Electricity and Service Water | Electricity Utility Act / Water and Sewage Act | City Hall / District Office / Ward Office | 7 days | |
Permission for Groundwater Development | Groundwater Act | City Hall / District Office / Ward Office | - | |
Wastewater Discharge Facilities | Water Quality Conservation Act | Environment Division | 10 days | |
Installation Report | - | KEPCO | - | |
Application for Jeonju Shifting and Electricity Lead-in | ||||
Application for Supply Water Construction | Road Act/Water Supply and Waterworks Installation Act | Waterworks Business | 20 days | |
After Completion | Application for Permission for Installations such as for Dangerous Substances Manufacture | Safety Control under Dangerous Substances Act | Fire Station | 5 days |
Application for Permission for Construction Usage | Building Act | Architectural Division | 7 days | |
Registration of Petroleum Sales Business | Enforcement Decree Of The Petroleum And Alternative Fuel Business Act | Regional Economy Division | 7 days | |
Certain Soil Pollution Contro | Soil Environment Conservation Act | Environment Division | 7 days | |
Report Installation of Subject Facilities | ||||
Wastewater Discharge Facilities | Water Quality Conservation Act | Environment Division | 10 days | |
Report Operation Launch | ||||
Change of Land Category and Control Book Management | Cadastral Act | Cadastre Department | 3 days | |
Building Preservation | Registration of Real Estate Act | District Court Registry Office | 3 days | |
Application for Registration | ||||
Soil Pollution Level Inspection | Environment Division | - | Within 6 months | |
Volatile Organic Compounds | Clean Air Conservation Act | Environment Division | 7 days | |
Report Drain Facilities |
Inquiry on Opening
Region | Phone | Address |
---|---|---|
Nationwide (Representative) | 82-2-2004-3012 | Yonsei Severance Bldg 2F, 10, Tongil-ro, Jung-gu, Seoul |
Seoul | 82-2-2004-3874 | Yonsei Severance Bldg 2F, 10, Tongil-ro, Jung-gu, Seoul |
Northern Gyeonggi | 82-2-837-9155 | Neo Tower Bldg 15F, 31, Simin-ro, Uijeongbu-si, Gyeonggi-do |
Southern Gyeonggi | 82-31-221-5189 | Saeyong Bldg 16F, 199, Gwongwang-ro, Paldal-gu, Suwon-si, Gyeonggi-do |
Incheon | 82-32-566-5188 | 585, Inju-daero, Namdong-gu, Incheon (Guwol-dong, Citi Bank Bldg) |
Gangwon | 82-33-744-4585 | 3F Hyudai Oilbank, Korea Land and Geospatial Informatix Corporation Bldg 2, Sicheong-ro, Wonju-si, Gangwon-do |
Daejeon | 82-42-480-2128 | Hyundai Marine & Fire Insurance Bldg 5F, 75 (Dunsan-dong), Dunsanseo-ro, Seo-gu, Daejeon |
Chungnam | 82-41-664-8533 | Daishin Securities Bldg 4F, 252 (Dongmun-dong), Angyeon-ro, Seosan-si, Chungcheongnam-do |
Chungbuk | 82-43-276-4367 | BYC Bldg 6F, 1037 (Bunpyeong-dong), 1sunhwan-ro, Seowon-gu, Cheongju-si, Chungcheongbuk-do |
Gwangju/Jeaonnam | 82-62-602-5145 | Hyundai Marine & Fire Insurance Bldg 8F, 72 (Chipyeong-dong), Sicheong-ro, Seo-gu, Gwangju |
Jeonbuk | 82-63-242-5151 | Tire Bank Bldg 13F, 751, Baekje-daero, Deokjin-gu, Jeonju-si, Jeollabuk-do |
Busan | 82-51-590-5128 | Busan Hyundai OB 3F, 107 (Geoje-dong), Asiad-daero, Yeonje-gu, Busan |
Ulsan | 82-52-227-9180 | Daewoo Securities Bldg 4F, 251 (Dal-dong), Samsan-ro, Nam-gu, Ulsan |
Gyeongnam | 82-55-289-6722 | Korea Cadastral Survey Corp 1F, 6 (Sinwol-dong), Changi-daero 532beon-gil, Uichang-gu, Changwon-si, Gyeongsangnam-do |
Daegu | 82-53-603-6665 | Yeongnam Tower 16F, 441, Dongdaegu-ro, Dong-gu, Daegu |
Gyeongbuk | 82-54-281-8181 | KT Bldg 5F, 346 (Daedo-dong), Posco-daero, Nam-gu, Pohang-si, Gyeongsangbuk-do |
Jeju | 82-64-712-5189 | Hyundai Motor Company 5F, 83 (Yeong-dong), Sammu-ro, Jeju-si, Jeju-do |
Opening Process
Business Suitability
of the Land
- Review Business Value
- Assure Securing of Safe Distance
- Review Possibility of Land Permission
weeks
Determination
- Determine Layout of the Building and Major Facilities
Approval of
Technology
Review Report
- Korea Gas Safety Corporation
- “PETROLEUM ACT” (SAFETY CONTROL AND BUSINESS OF LIQUEFIED PETROLEUM GAS ACT)
weeks
Permission for
constructing
Charging Station
- City/Town Industrial (Regional) Economic Division
- Design Office Selection/Discussion
weeks
Assessment
- In case of more than 1,500㎡of Site Area located within the Maintenance Area of City Traffic
weeks
Permission
- Change of Land Shape and Quality / Site Review / Permission for Road Occupation
- Select Construction and Gas Facility Installation Company
- Supervise Construction
- Intermediate Inspection
months
Completion
- Inspection of Completion on Gas Facilities
- Inspection of Completion on Construction Buildings
- Payment of Acquisition Tax and Preservation Registration
of Business
- Business Commencement Report (Approved Offices)
- Business Registration (Competent Tax Office within 20 days from the business opening date)
Requirements of Permission
Areas with Installation Permission
- Urban area: Manufacturing area, Green area (Residential / Business area is not permitted)
- Agricultural area: Forest / Siting / Miscellaneous Land
- Permission for Green Belt for Preservation / Productive Green Area is determined and authorized according to Urban Planning Ordinance.
- Other area with usage limited by Notification from City/Town Governor
Safety Distance
- In case of Underground Facilities with Storage Tank (20 tons of capacity)
Facilities | Standard | Boundary Distance of Business Place | Distance from Protective Facilities |
---|---|---|---|
Storage Facilities | Outer surface | 18.9m | 50m |
Charging Facilities | Outer surface | 24m | |
Tank Lorry Importation | Centerline | 24m |
* Protective Facilities: All housing and residential facilities including Class 1 and 2 protective facilities. (Temporary Construction Buildings excluded)
* In the case that the subjective site is near a road/sewer/stream/lake, a site with less area can be permitted
as the end of the opposite site is considered to be the boundary of the business place.
- School Health Act (in case of nearby schools located nearby)
It must be separated 200m from the school boundary. (For 500m, permissible under approval of Purification Committee)
Inquiry on Opening Charging Station
Area | Contact number | Address |
---|---|---|
Seoul/Gyeonggi/Gangwon | 82-2-2004-3676 | Yonsei Severance Bldg 20F, 10, Tongil-ro, Jung-gu, Seoul |
Daejeon/Chungcheong | 82-43-283-7515 | BYC Bldg 6F, 1037, 1sunhwan-ro, Seowon-gu, Cheongju-si, Chungcheongbuk-do |
Busan/Daegu/Gyeongsangdo | 82-53-603-6660 | Yeongnam Tower 16F, 441, Dongdaegu-ro, Dong-gu, Daegu |
Gwangju/Jeollado | 82-62-602-5151 | Hyundai Marine & Fire Insurance Bldg 8F, 72, Sicheong-ro, Seo-gu, Gwangju |